Transmission Lines
The Devoll Hydropower Project included the construction of two transmission lines; one 220 kV line and one 110 kV line
These two transmission lines are connecting the power plants to the Albanian national electricity grid.
1. Moglicë HPP – Kokël HPP – Elbasan 2 substation
220 kV line – approx. 48 km
This transmission line is constructed in the area of Gramsh and Elbasan Municipalities.
2. Banjë HPP – Cërrik substation
110 kV line – approx.12 km
This Transmission Line is constructed in the area of Cërrik Municipality.
These transmission lines have been handed over to the Albanian Transmission System Operator.